Saturday, February 25, 2012

A little more progress.

I've successfully assembled a small length of track with the new ties in place. They really change the look of the track greatly. I have worked this small length into a tiny bridge that I will use on the system. One of many, many bridges and trestles needed. I will post photos next week of this along with the completed vertical boiler teakettle.

No comments:

Post a Comment