I am painting the vertical boiler loco now but I am going to have to back track a little. One part needs to be redone and its already glued in place. Some careful surgery will be required. I debated doing this but I believe it really needs to be corrected. Photos will be postponed during surgery and recovery.
I had to make most of my own pipe connections and valves from plastic and resin nut castings. Cambrian Models valve handles worked very well. The driver also came out nicely. He is a reworked figure from New Zealand.
For the next two weeks I won't be able to work on The Last Resort as I have a miniatures show to prepare for on the second. Going to be difficult keeping my hands off of it for all that time!
No comments:
Post a Comment